Do you want to receive an email when news items are posted?
On Monday 25th January we will be carrying out inspection surveys of the drainage system on a section of Aston Church Road, to help us prepare to build the railway.
To be able to do this safely we will need to install temporary three-way traffic lights along a specified area of Aston Church Road.
The lights will be in place until Thursday 28 th January and will be operational from 09.30am until 15.30pm each day.
Posted on 17th December 2020
by HS2